The workflow instance details provide information about a specific time a workflow ran.
The Activities tab lists activities the workflow has performed with their duration, work duration (the time they have been actively completing a task as opposed to waiting), status, start time, and end time.
Note: Activities that have multiple components will display a separate activity for each component. For example, a Route Entry to User activity may show an activity for setting a tag, sending an e-mail, and moving an entry.
- Running: Activities that are currently running, usually these activities will be waiting.
- Completed: Activities that have completed running.
- All: All activities that have run.
- Long-running: Completed activities that ran for more than one second and currently running activities that have been running for more than one second. This category does not include composite activities (see below).
- Non-composite: Activities that do not contain other activities. For example, the E-mail or Create Link activities will be in this category but not the Repeat or Conditional Parallel activities.
- Composite: Activities that contain other activities, such as the Repeat or Conditional Parallel activities.
This documentation is specific to version 9.0. You can find the most up-to-date help files for the latest version at Current Online Laserfiche Product Help Files. For further help or feedback, please see the Laserfiche Support Site. |
© 2013 Laserfiche |